Files
gochat/docs/ops/01-rolling-upgrade.md
T
rogee 0dabb8cfa5 docs: 整理文档目录结构 — 清理过时文档、归集功能子目录、统一命名规范
清理:
- 删除 34 份过时文档(gap reports/QA临时报告/验收报告/阶段性文档)
- 删除 docs/.hermes/skills 第三方 skills 副本(16 文件)
- 删除 skills-lock.json

目录归集:
- 根目录仅保留 README.md 索引
- product/ — 产品与架构设计(PRD + ARCHITECTURE + P2设计文档 + AI/企业路线图)
- tracking/ — Chatwoot parity 开发跟踪
- requirements/ — M01-M12 模块需求
- plans/ — 历史实现计划
- parity/ — 路由 parity 与前端契约
- qa/ — QA 报告与测试计划
- ops/ — 运维部署

命名规范:
- 全小写 kebab-case,禁止全大写文件名
- product/tracking/ops 用 NN- 序号前缀
- requirements 用 MNN- 两位零填充模块号
- plans/qa 用 YYYY-MM-DD- 日期前缀
- requirements M1-M9 零填充为 M01-M09(修复字典序)

同步更新:
- backend/cmd/route_parity/main.go 路径默认值
- backend/scripts/parity_frontend_smoke.sh 报告路径
- 所有 docs 内部交叉引用
- .gitignore 排除编译产物 (backend/gochat, backend/route_parity)
- 新增迁移 000052/000053
- 前端 WS 相关修改
2026-07-09 14:53:27 +08:00

2.7 KiB

GoChat Rolling Upgrade Strategy

Reference: Chatwoot deployment uses zero-downtime upgrade pattern

Overview

GoChat follows a blue-green deployment strategy for production upgrades, ensuring zero downtime during version transitions.

Upgrade Process

Step 1: Pre-flight Checks

  1. Verify new Docker image is built and pushed: docker pull gochat/gochat:${NEW_VERSION}
  2. Run database migrations on a staging environment first
  3. Verify backward compatibility of migrations (new code must work with old schema)
  4. Check feature flags — new features should be disabled by default

Step 2: Database Migration

# Run migrations BEFORE deploying new code
# Migrations must be backward-compatible
docker compose -f docker-compose.prod.yml exec gochat /app/gochat migrate up

Step 3: Blue-Green Deployment (Docker Compose)

# 1. Deploy new version as "green" alongside "blue" (current)
docker compose -f docker-compose.prod.yml up -d --no-deps gochat-green

# 2. Wait for health check to pass
curl -f http://gochat-green:3000/health

# 3. Switch traffic (update nginx/upstream config)
# nginx: switch upstream from blue to green

# 4. Drain old connections on blue
# Wait 30s for in-flight requests to complete

# 5. Stop blue
docker compose -f docker-compose.prod.yml stop gochat

Step 4: K8s Rolling Update

# Kubernetes handles rolling updates automatically via Deployment strategy
kubectl set image deployment/gochat gochat=gochat/gochat:${NEW_VERSION}
kubectl rollout status deployment/gochat

K8s config (in Helm chart):

  • maxSurge: 1 (one extra pod during rollout)
  • maxUnavailable: 0 (no pods allowed to be unavailable)
  • readinessProbe: /ready endpoint
  • livenessProbe: /live endpoint

Step 5: Verification

  1. Smoke test: hit /health, /ready endpoints
  2. Check logs for errors: docker compose logs gochat --since 5m
  3. Verify metrics: Prometheus dashboard should show normal traffic
  4. Monitor for 15 minutes before finalizing

Step 6: Rollback (if needed)

# Docker Compose rollback
docker compose -f docker-compose.prod.yml exec gochat /app/gochat migrate down ${N}
docker compose -f docker-compose.prod.yml up -d --no-deps gochat-${OLD_VERSION}

# K8s rollback
kubectl rollout undo deployment/gochat

Migration Compatibility Rules

  • Migrations MUST be additive only in production (add columns, never remove)
  • Column removals require a 2-phase migration: soft-remove then hard-remove
  • New columns should have defaults or be nullable
  • Renames require a 3-phase migration: add new → copy data → remove old

Worker Upgrade

Workers drain naturally: set a shutdown deadline, let in-flight jobs finish, then stop. New workers pick up queued jobs from Redis.