Tasks: Extension Command for Multi-Extension Normalization

Input: Design documents from /specs/004-extension-rename/ Prerequisites: plan.md, spec.md, research.md, data-model.md, contracts/

Tests: Contract and integration tests are included because the specification mandates deterministic previews, ledger-backed undo, and automation safety.

Organization: Tasks are grouped by user story to enable independent implementation and testing of each story.

Phase 1: Setup (Shared Infrastructure)

Purpose: Establish initial package and CLI scaffolding.

  • T001 Create package doc stub for extension engine in internal/extension/doc.go
  • T002 Register placeholder Cobra subcommand in cmd/extension.go and wire it into cmd/root.go

Phase 2: Foundational (Blocking Prerequisites)

Purpose: Core data structures and utilities required by all user stories.

  • T003 Define ExtensionRequest parsing helpers in internal/extension/request.go
  • T004 Define ExtensionSummary, preview statuses, and metadata container in internal/extension/summary.go
  • T005 Implement case-insensitive normalization and dedup helpers in internal/extension/normalize.go

Checkpoint: Foundation ready — user story implementation can now begin.


Phase 3: User Story 1 Normalize Legacy Extensions in Bulk (Priority: P1) 🎯 MVP

Goal: Provide preview and apply flows that replace multiple source extensions with a single target extension across the scoped filesystem.

Independent Test: In a directory containing mixed .jpeg, .JPG, and .png files, run renamer extension .jpeg .JPG .png .jpg --dry-run to inspect preview output, then run with --yes to confirm filesystem updates.

Tests for User Story 1

  • T010 [P] [US1] Add preview/apply contract coverage in tests/contract/extension_command_test.go
  • T011 [P] [US1] Add normalization happy-path integration flow in tests/integration/extension_flow_test.go

Implementation for User Story 1

  • T006 [US1] Implement scoped candidate discovery and planning in internal/extension/engine.go
  • T007 [US1] Render deterministic preview entries with change/no-change markers in internal/extension/preview.go
  • T008 [US1] Apply planned renames with filesystem operations in internal/extension/apply.go
  • T009 [US1] Wire Cobra command to preview/apply pipeline with scope flags in cmd/extension.go

Checkpoint: User Story 1 functional and independently testable.


Phase 4: User Story 2 Automation-Friendly Extension Updates (Priority: P2)

Goal: Ensure ledger entries, exit codes, and undo support enable scripted execution without manual intervention.

Independent Test: Execute renamer extension .yaml .yml .yml --yes --path ./fixtures, verify exit code 0, inspect .renamer ledger for metadata, then run renamer undo to restore originals.

Tests for User Story 2

  • T015 [P] [US2] Extend contract tests to verify ledger metadata and exit codes in tests/contract/extension_ledger_test.go
  • T016 [P] [US2] Add automation/undo integration scenario in tests/integration/extension_undo_test.go

Implementation for User Story 2

  • T012 [US2] Persist extension-specific metadata during apply in internal/extension/apply.go
  • T013 [US2] Ensure undo and CLI output handle extension batches in cmd/undo.go
  • T014 [US2] Guarantee deterministic exit codes and non-match notices in cmd/extension.go

Checkpoint: User Stories 1 and 2 functional and independently testable.


Phase 5: User Story 3 Validate Extension Inputs and Conflicts (Priority: P3)

Goal: Provide robust input validation and conflict detection to prevent unsafe applies.

Independent Test: Run renamer extension .mp3 .MP3 mp3 --dry-run to confirm validation failure for missing dot, and run a collision scenario to verify preview conflicts block apply.

Tests for User Story 3

  • T020 [P] [US3] Add validation and conflict contract coverage in tests/contract/extension_validation_test.go
  • T021 [P] [US3] Add conflict-blocking integration scenario in tests/integration/extension_validation_test.go

Implementation for User Story 3

  • T017 [US3] Implement CLI argument validation and error messaging in internal/extension/parser.go
  • T018 [US3] Detect conflicting target paths and accumulate preview warnings in internal/extension/conflicts.go
  • T019 [US3] Surface validation failures and conflict gating in cmd/extension.go

Checkpoint: All user stories functional with independent validation.


Phase 6: Polish & Cross-Cutting Concerns

Purpose: Documentation, tooling, and quality improvements spanning multiple stories.

  • T022 Update CLI flag documentation for extension command in docs/cli-flags.md
  • T023 Add smoke test script covering extension preview/apply/undo in scripts/smoke-test-extension.sh
  • T024 Run gofmt and go test ./... from repository root ./

Dependencies & Execution Order

Phase Dependencies

  1. Setup (Phase 1) → primes new package and CLI wiring.
  2. Foundational (Phase 2) → must complete before any user story work.
  3. User Story Phases (35) → execute in priority order (P1 → P2 → P3) once foundational tasks finish.
  4. Polish (Phase 6) → after desired user stories are complete.

User Story Dependencies

  • US1 (P1) → depends on Phase 2 completion; delivers MVP.
  • US2 (P2) → depends on US1 groundwork (ledger metadata builds atop apply logic).
  • US3 (P3) → depends on US1 preview/apply pipeline; validation hooks extend existing command.

Task Dependencies (Selected)

  • T006 depends on T003T005.
  • T007, T008 depend on T006.
  • T009 depends on T006T008.
  • T012 depends on T008.
  • T013, T014 depend on T012.
  • T017 depends on T003, T005.
  • T018 depends on T006T007.
  • T019 depends on T017T018.

Parallel Execution Examples

  • Within US1: After T009, tasks T010 and T011 can run in parallel to add contract and integration coverage.
  • Across Stories: Once US1 implementation (T006T009) is complete, US2 test tasks T015 and T016 can proceed in parallel while T012T014 are under development.
  • Validation Work: For US3, T020 and T021 can execute in parallel after T019 ensures CLI gating is wired.

Implementation Strategy

MVP First

  1. Complete Phases 12 to establish scaffolding and data structures.
  2. Deliver Phase 3 (US1) to unlock core extension normalization (MVP).
  3. Validate with contract/integration tests (T010, T011) and smoke through Quickstart scenario.

Incremental Delivery

  1. After MVP, implement Phase 4 (US2) to add ledger/undo guarantees for automation.
  2. Follow with Phase 5 (US3) to harden validation and conflict handling.
  3. Finish with Phase 6 polish tasks for documentation and operational scripts.

Parallel Approach

  1. One developer completes Phases 12.
  2. Parallelize US1 implementation (engine vs. CLI vs. tests) once foundations are ready.
  3. Assign US2 automation tasks to a second developer after US1 apply logic stabilizes.
  4. Run US3 validation tasks concurrently with Polish updates once US2 nears completion.