Tasks: Extension Command for Multi-Extension Normalization
Input: Design documents from /specs/004-extension-rename/
Prerequisites: plan.md, spec.md, research.md, data-model.md, contracts/
Tests: Contract and integration tests are included because the specification mandates deterministic previews, ledger-backed undo, and automation safety.
Organization: Tasks are grouped by user story to enable independent implementation and testing of each story.
Phase 1: Setup (Shared Infrastructure)
Purpose: Establish initial package and CLI scaffolding.
- T001 Create package doc stub for extension engine in
internal/extension/doc.go - T002 Register placeholder Cobra subcommand in
cmd/extension.goand wire it intocmd/root.go
Phase 2: Foundational (Blocking Prerequisites)
Purpose: Core data structures and utilities required by all user stories.
- T003 Define
ExtensionRequestparsing helpers ininternal/extension/request.go - T004 Define
ExtensionSummary, preview statuses, and metadata container ininternal/extension/summary.go - T005 Implement case-insensitive normalization and dedup helpers in
internal/extension/normalize.go
Checkpoint: Foundation ready — user story implementation can now begin.
Phase 3: User Story 1 – Normalize Legacy Extensions in Bulk (Priority: P1) 🎯 MVP
Goal: Provide preview and apply flows that replace multiple source extensions with a single target extension across the scoped filesystem.
Independent Test: In a directory containing mixed .jpeg, .JPG, and .png files, run renamer extension .jpeg .JPG .png .jpg --dry-run to inspect preview output, then run with --yes to confirm filesystem updates.
Tests for User Story 1
- T010 [P] [US1] Add preview/apply contract coverage in
tests/contract/extension_command_test.go - T011 [P] [US1] Add normalization happy-path integration flow in
tests/integration/extension_flow_test.go
Implementation for User Story 1
- T006 [US1] Implement scoped candidate discovery and planning in
internal/extension/engine.go - T007 [US1] Render deterministic preview entries with change/no-change markers in
internal/extension/preview.go - T008 [US1] Apply planned renames with filesystem operations in
internal/extension/apply.go - T009 [US1] Wire Cobra command to preview/apply pipeline with scope flags in
cmd/extension.go
Checkpoint: User Story 1 functional and independently testable.
Phase 4: User Story 2 – Automation-Friendly Extension Updates (Priority: P2)
Goal: Ensure ledger entries, exit codes, and undo support enable scripted execution without manual intervention.
Independent Test: Execute renamer extension .yaml .yml .yml --yes --path ./fixtures, verify exit code 0, inspect .renamer ledger for metadata, then run renamer undo to restore originals.
Tests for User Story 2
- T015 [P] [US2] Extend contract tests to verify ledger metadata and exit codes in
tests/contract/extension_ledger_test.go - T016 [P] [US2] Add automation/undo integration scenario in
tests/integration/extension_undo_test.go
Implementation for User Story 2
- T012 [US2] Persist extension-specific metadata during apply in
internal/extension/apply.go - T013 [US2] Ensure undo and CLI output handle extension batches in
cmd/undo.go - T014 [US2] Guarantee deterministic exit codes and non-match notices in
cmd/extension.go
Checkpoint: User Stories 1 and 2 functional and independently testable.
Phase 5: User Story 3 – Validate Extension Inputs and Conflicts (Priority: P3)
Goal: Provide robust input validation and conflict detection to prevent unsafe applies.
Independent Test: Run renamer extension .mp3 .MP3 mp3 --dry-run to confirm validation failure for missing dot, and run a collision scenario to verify preview conflicts block apply.
Tests for User Story 3
- T020 [P] [US3] Add validation and conflict contract coverage in
tests/contract/extension_validation_test.go - T021 [P] [US3] Add conflict-blocking integration scenario in
tests/integration/extension_validation_test.go
Implementation for User Story 3
- T017 [US3] Implement CLI argument validation and error messaging in
internal/extension/parser.go - T018 [US3] Detect conflicting target paths and accumulate preview warnings in
internal/extension/conflicts.go - T019 [US3] Surface validation failures and conflict gating in
cmd/extension.go
Checkpoint: All user stories functional with independent validation.
Phase 6: Polish & Cross-Cutting Concerns
Purpose: Documentation, tooling, and quality improvements spanning multiple stories.
- T022 Update CLI flag documentation for extension command in
docs/cli-flags.md - T023 Add smoke test script covering extension preview/apply/undo in
scripts/smoke-test-extension.sh - T024 Run gofmt and
go test ./...from repository root./
Dependencies & Execution Order
Phase Dependencies
- Setup (Phase 1) → primes new package and CLI wiring.
- Foundational (Phase 2) → must complete before any user story work.
- User Story Phases (3–5) → execute in priority order (P1 → P2 → P3) once foundational tasks finish.
- Polish (Phase 6) → after desired user stories are complete.
User Story Dependencies
- US1 (P1) → depends on Phase 2 completion; delivers MVP.
- US2 (P2) → depends on US1 groundwork (ledger metadata builds atop apply logic).
- US3 (P3) → depends on US1 preview/apply pipeline; validation hooks extend existing command.
Task Dependencies (Selected)
- T006 depends on T003–T005.
- T007, T008 depend on T006.
- T009 depends on T006–T008.
- T012 depends on T008.
- T013, T014 depend on T012.
- T017 depends on T003, T005.
- T018 depends on T006–T007.
- T019 depends on T017–T018.
Parallel Execution Examples
- Within US1: After T009, tasks T010 and T011 can run in parallel to add contract and integration coverage.
- Across Stories: Once US1 implementation (T006–T009) is complete, US2 test tasks T015 and T016 can proceed in parallel while T012–T014 are under development.
- Validation Work: For US3, T020 and T021 can execute in parallel after T019 ensures CLI gating is wired.
Implementation Strategy
MVP First
- Complete Phases 1–2 to establish scaffolding and data structures.
- Deliver Phase 3 (US1) to unlock core extension normalization (MVP).
- Validate with contract/integration tests (T010, T011) and smoke through Quickstart scenario.
Incremental Delivery
- After MVP, implement Phase 4 (US2) to add ledger/undo guarantees for automation.
- Follow with Phase 5 (US3) to harden validation and conflict handling.
- Finish with Phase 6 polish tasks for documentation and operational scripts.
Parallel Approach
- One developer completes Phases 1–2.
- Parallelize US1 implementation (engine vs. CLI vs. tests) once foundations are ready.
- Assign US2 automation tasks to a second developer after US1 apply logic stabilizes.
- Run US3 validation tasks concurrently with Polish updates once US2 nears completion.