E27 stack: conditional impl tier + final-review tier pin + narration recipe + terse reviewer contract

This commit is contained in:
Jesse Vincent
2026-06-10 23:34:18 -07:00
committed by Jesse Vincent
parent 90b5433f59
commit 35464d67c0
2 changed files with 10 additions and 0 deletions

View File

@@ -11,6 +11,9 @@ Execute plan by dispatching a fresh implementer subagent per task, a task review
**Core principle:** Fresh subagent per task + task review (spec + quality) + broad final review = high quality, fast iteration
**Narration:** between tool calls, narrate at most one short line — the
ledger and the tool results carry the record.
**Continuous execution:** Do not pause to check in with your human partner between tasks. Execute all tasks from the plan without stopping. The only reasons to stop are: BLOCKED status you cannot resolve, ambiguity that genuinely prevents progress, or all tasks complete. "Should I continue?" prompts and progress summaries waste their time — they asked you to execute the plan, so execute it.
## When to Use
@@ -88,6 +91,8 @@ Use the least powerful model that can handle each role to conserve cost and incr
**Integration and judgment tasks** (multi-file coordination, pattern matching, debugging): use a standard model.
**Architecture and design tasks**: use the most capable available model.
The final whole-branch review is one of these — dispatch it on the most
capable available model, not the session default.
**Review tasks**: choose the model with the same judgment, scaled to the
diff's size, complexity, and risk. A small mechanical diff does not need the