With merged review, a planted verbatim-duplication defect shipped: the
reviewer rated it Minor (YAGNI) under the strict cannot-be-trusted
definition of Important, and the Minor-rolls-up rule meant no fix was
ever dispatched and the final review never saw the finding. Calibration
now names merge-blocking maintainability damage (verbatim duplication,
swallowed errors, assertion-free tests) as Important, and controllers
must paste accumulated Minor findings into the final review dispatch.
Iteration-1 profiling: implementers and per-dispatch overhead dominate
(429 of 686 subagent turns; controller coordination is half the dollars
and scales with dispatch count), reviewers are individually lean, and
the controller pasted the diff in only 2 of 22 review dispatches when
the guidance was phrased as optional.
Changes: spec-reviewer-prompt.md + code-quality-reviewer-prompt.md
replaced by task-reviewer-prompt.md (one reviewer, one reading of a
pasted diff, two verdicts: spec compliance ✅/❌/⚠️ and task quality);
one fix dispatch can address both kinds of findings; controller now
runs git diff itself and pastes it (imperative, not optional);
implementers run focused tests while iterating and the full suite once
before committing; flowchart, example, Red Flags, tool tables updated.
The broad final whole-branch review is unchanged.